Project · Remedial Repairs & Waterproofing · Glebe
Balcony rebuild and waterproofing, Glebe
A terrace balcony in Glebe demolished, prepared, waterproofed in stages and finished with new terracotta tiles.

What we did
The existing balcony surface was demolished and the substrate prepared. We then applied the waterproofing membrane in stages, the grey coats in the photos, with each coat left to cure before the next. Our tiler finished the job with new terracotta tiles.
This was our own private project, run at the same time as a rooftop terrace in another Glebe house. Together the two jobs took about four weeks.
Scope
- Demolition of the old balcony surface
- Substrate preparation
- Multi-coat waterproofing membrane
- New tiles laid by our tiler
Project facts
- Location
- Glebe, Inner West, Sydney
- When
- October to December 2025
- Duration
- About 4 weeks, run alongside a second Glebe job
- Delivered for
- Our own client, contracted directly with us
- Sector
- Residential
- Services
- Remedial Repairs & Waterproofing